Construction of a 3-level multipurpose warehouse in the Barrio Antioquía sector (Medellin) from the foundation, Structure and enclosures and general installations stage.
Activities included floor recovery for the Olympic pool area, involving the removal and replacement of the base structure, adhesive application, and surface polishing and protection.